Zhongtong Automotive Industry Group Co., Ltd.

Part One of the Emission Permit Implementation Report for the Third Quarter of 2024

2024/10/14 12:51

Part One of the Emission Permit Implementation Report for the Third Quarter of 2024




 

Pollution Discharge Permit Execution Report

(Quarterly Report)






 

Pollution Discharge Permit Number:913715001678508838001Q

Unit Name:Zhongtong Automobile Industry Group Co., Ltd.

Reporting Period:2024Year3Quarter

Legal Representative (Actual Responsible Person):Liu Zhengtao

Technical Responsible Person:Liu Qing

Fixed Phone:0635-8518857

Mobile Phone:15666659202




 

Polluting Unit Name (Seal)

Report Date:2024Year10Month08Day

 

 

Commitment Letter

 

Liaocheng City Ecological Environment Bureau:

Zhongtong Automobile Industry Group Co., Ltd.I hereby commit that all contents and data in the submitted pollution discharge permit execution report are true and valid, and I am willing to bear corresponding legal responsibilities. Our unit will consciously accept supervision from the environmental protection authorities and public oversight. If the submitted contents and data do not match the actual situation, we will actively cooperate with the investigation and accept penalties according to the law.

This is a commitment.






 

Unit Name:                     (Seal)

Legal Representative:                    (Signature)

Date:

 

I. Basic Information of the Enterprise

(1) Basic Information of the Polluting Unit

Basic Information of the Polluting Unit

Note1: If the measurement unit is selected as other, please specify the specific unit name in the remarks.

 

Record Content

Production Unit

Name

Quantity or Content

Measurement Unit

Remarks

Main Raw Material Usage

Blanking

Metal Plate-Steel Plate

17.9

Ton

 

Stamping

Metal Plate-Steel Plate

0

Ton

 

Machining

Metal Plate-Steel Plate

0

Ton

 

Welding

Metal Plate-Steel Plate

17.9

Ton

 

Pre-treatment

Metal Plate-Steel Plate

0

Ton

 

Main Auxiliary Material Usage

Coating

Colored Paint Material-Colored Paint

0.601

Ton

 

Colored Paint Material-Thinner

0.611

Ton

 

Filter Cotton (VOCThree-stage Filtration)

0

Ton

 

Welding

Welding Material-Welding Wire

0.115

Ton

 

Pre-treatment

Bag Dust Collector (Shot Blasting Machine)

0

Ton

 

Energy Consumption

Industrial Furnace

Natural Gas Usage

2200

 

Coating

Natural Gas Usage

9000

 

Electricity Consumption

363474

KWh

 

Welding

Electricity Consumption

40386

KWh

 

Operating Time and Production Load

Blanking

Normal Operating Time

98.5

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

13

%

 

Others

Normal Operating Time

0

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

0

%

 

Stamping

Normal Operating Time

0

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

0

%

 

Industrial Furnace

Normal Operating Time

81.44

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

16

%

 

Machining

Normal Operating Time

0

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

0

%

 

Testing

Normal Operating Time

0

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

0

%

 

Coating

Normal Operating Time

213.42

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

82

h

 

Production Load

28

%

 

Welding

Normal Operating Time

114

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

15

%

 

Assembly

Normal Operating Time

0

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

0

%

 

Pre-treatment

Normal Operating Time

0

h

 

Abnormal Operating Time

0

h

 

Production Suspension Time

0

h

 

Production Load

0

%

 

Main Product Output

Assembly

Modified Vehicles

33

Others

Units

Water Intake

Blanking

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Others

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Stamping

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Industrial Furnace

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Machining

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Testing

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Coating

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Welding

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Assembly

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Pre-treatment

Water Intake Volume

0

t

 

Wastewater Discharge Volume

0

t

 

Pollution Control Facility Investment Plan

Entire Plant

Control Facility Number

None

Others

None

Control Facility Type

None

/

 

Start Time

None

Others

None

Construction and Production Start Time

None

Others

None

Planned Total Investment

None

Ten Thousand Yuan

 

Cumulative Investment Completed During the Reporting Period

None

Ten Thousand Yuan

 

 

 

(2) Fuel Analysis Table

Fuel Analysis Table

Note: If the reporting template does not involve this page content, there is no need to fill it out.

Main Production Unit Name

Production Facility Number

Production Facility Name

Fuel Name

Actual Usage (10,000t, 10,000m³)

Solid or Liquid Fuel Report Submission

Gas Fuel Report Submission

Received Ash ContentAar(%)

Received Total SulfurSt.ar(%)

Received CarbonCar(%)

Dry Ash-FreeVdafVolatile Matter (%)

Received Lower Heating ValueQnet.ar(MJ/kg,MJ/m³)

Hydrogen Sulfide (%,mg/m³)

Total Sulfur (%,mg/m³)

Lower Heating Value (MJ/m³)