Zhongtong Automotive Industry Group Co., Ltd.

Zhongtong New Energy Vehicle Co., Ltd. Laser Welding Machine Equipment Tender Announcement

2024/02/22 10:09

Zhongtong New Energy Automobile Co., Ltd.

ZTO New Energy

Zhongtong New Energy Vehicle Co., Ltd. Laser Welding Machine Equipment Tender Announcement

1. Project Overview and Parameter Requirements:

Procurement Project: Purchase one unit each of 2KW and 3KW handheld laser welding equipment

1. Main Equipment Parameter Requirements:

(1) Technical Parameters of Handheld Laser Welding Machine

 

Project 2000W Specification Parameters 3000W Specification Parameters
Maximum Laser Power 2000W 3000W
Laser Brand IPG, Raycus, Chuangxin IPG, Raycus, Chuangxin
Welding Gun Manufacturer Chaoqiang Weiye or equivalent level Chaoqiang Weiye or equivalent level
Fiber Length >=10m >=15m
Weld Width 0-5mm 0-5mm
Welding Penetration Depth 0.1-4mm 0.1-4mm
Welding Gun Welding Angle Supports welding at various angles Supports welding at various angles
Welding Head Swing welding head with filler wire device Swing welding head with filler wire device
Filler Wire Line Length >=4m >=4m
Filler Wire Feeding Method Single wire feeding Double wire feeding
Protective Gas Nitrogen/Argon/Argon-Carbon Dioxide Mixed Gas Nitrogen/Argon/Argon-Carbon Dioxide Mixed Gas
Cooling Method Water Cooling Water Cooling
Welding Gun Head Weight Not exceeding 1kg Not exceeding 1kg
Applicable Filler Wire Diameter 0.8/1.0/1.2/1.6 mm 0.8/1.0/1.2/1.6 mm
Additional Functions With surface cleaning and metal cutting functions With surface cleaning and metal cutting functions

 

(2) Service Scope:

 

Serial Number Service Project Name Responsible Party Remarks
Buyer Seller
1 Design    
2 Manufacturing    
3 Painting    
4 Packaging    
5 Transportation    
6 Unloading and Hoisting Assistance  
7

Installation, Debugging (including

test pieces, electricity, gas)

   
8 Final Acceptance Buyer provides test pieces
9 Training   More than 3 working days
10 Technical Service   >=2 years
11 After-sales Service   >=2 years

 

2. Bidding Unit: Zhongtong New Energy Vehicle Co., Ltd.

3. Bidding Location: Room 206, Zhongtong Technology Building, No. 9 Zhonghua Road, Liaocheng Economic Development Zone, Shandong

4. Contact Person: Liang Ming 13676357006; Wu Zhiliang 15063582101

5. Bidding Time: February 28, 2024, 14:00

6. Bid Security and Requirements;

Bidders participating in this project must comply with the following requirements:

(1) The bidder shall pay 5000 yuan (RMB) to the financial department of the bidding party as the bid security for this bidding.

的投标保证金。

*Payment Method: Basic account transfer

 

Bank: Industrial and Commercial Bank of China, Liaocheng Zhenxing Road Branch
Account Name: Zhongtong New Energy Vehicle Co., Ltd.
Account Number: 1611002319024785961
Taxpayer Identification Number: 91371500MA3C9UQJ5J

 

(2) The bid security must be transferred to the designated account before 17:00 on February 27, 2024, and note "Laser Welding Machine Bid Security". Bidders who transfer after the deadline will not be able to participate in the bidding. After the security is successfully transferred, the bidder must send the refund account, account name, bank name, bank number, and bank location to ZTXNYGG@163.com, otherwise it will affect the refund of the security.

(3) The following situations may result in the forfeiture of the security:

① If the bid becomes invalid or affects normal bidding due to the bidder's reasons;

② Before the bid opening, if the bidder does not come to bid on the bid deadline without justifiable reasons and without submitting a written explanation;

③ Within 30 days from the date of the issuance of the winning (transaction) notice, if the winning (transaction) party does not sign the contract without justifiable reasons;

④ If it is verified that there are violations such as collusion in bidding, surrounding bidding, or accompanying bidding during the bidding process;

⑤ If the bidder has breach of contract or violation behavior or is complained about, the security will not be refunded during the investigation period, and will be handled according to relevant regulations after the investigation is completed.

(4) The deposit transfer must use the company's public account and cannot use a personal account. If there are no violations of the above, the bidding party will refund the principal of the bid deposit to the unsuccessful bidders without interest within 1-2 payment cycles after determining the winning bidder.

7. Bidding Requirements:

1. The bidding unit must be a general taxpayer and provide relevant qualification certificates and business licenses; 2. The bidding unit must actively contact the bidding unit for inquiries and cannot change equipment parameters and pricing after bidding on the grounds of being unfamiliar with the project overview and equipment requirements.

3. In order to assist in the review, evaluation, and comparison of the bid documents, the bidding unit may request the bidding unit to clarify the bid documents at any time, and may also visit the bidding unit and production base for on-site verification.

4. Performance Requirements: The supplier should have a mature market in the country and provide no less than 3 sets of relevant or similar equipment in the market within the last three years, and must have won at least one mechanical processing enterprise (provide copies of sales contracts, copies of winning notices, or a user list with official seals).

5. To ensure the smooth progress of the bidding work, the bidding unit must send the equipment configuration and parameters (no quotation required) to the company email: ZTXNYGG@163.com by 5:00 PM on February 27, 2024, for early understanding and communication.

6. There are no administrative penalties or dishonesty records in the "National Enterprise Credit Information Publicity System" platform; 7. No bidding violations, false annual report information, provision of false qualification materials, or other administrative penalty records.

8. Not listed on the blacklist of China National Heavy Duty Truck Group Co., Ltd.

8. Bid Document Preparation Requirements

1. The first part is the bidding commitment letter and the legal person authorization letter.

2. The second part is the product quotation form, which should list the quotation details, including direct material costs, manufacturing costs, taxes, profits, and other sub-items; the submitted materials should include: detailed configuration list of the complete machine, parts list.

(Specifications, models, quantities, materials, consumable replacement cycles, unit prices, etc.), main material origin, brand.

3. The third part is the delivery period and quality assurance measures, after-sales service commitments, etc.

9. Others

1. Number of bid documents: one original and two copies.

2. The bidding unit must ensure that all bidding materials are true and valid. If the bidding unit discovers that the bidding party has falsified bidding materials or during the contract performance process, the bidding party has the right to terminate the contract and recover economic losses from the bidding unit, while also listing the bidding unit on the credit blacklist.

                                   

February 22, 2024